Hi experts ,
What could be all reason , if a SMD Agent get down OR automatically shutdown .?
Hi experts ,
What could be all reason , if a SMD Agent get down OR automatically shutdown .?
Hi Experts,
We could not complete the system copy import since it always stopped at RUN JLOAD task. We tried to do a fresh installation but same error was experienced. Do you know what could probably cause the error? Is there any work around?
See below for further details:
We are currently doing a system copy import of SolMan 7.1 from another server with the same OS and DB which is windows 2012 R2 and Oracle 12c. It's a standard system copy procedure using SWPM.
We have passed the import ABAP and import JAVA dump phases but we got stuck on the RUN JLOAD task. Status of JLoad.java is stuck at "Connecting to database". We let it run for 2 days but there were no changes still.
Appreciate your help.
We have downstream systems of type Evaluation and Training which are setup via transport routes to receive transports after the Production system.
----> EVAL
DEV -> QA -> PROD ---|
-----> TRAIN
Client role settings are set to (D) "Demo" in the Evaluation Client and (E)Training/Education in the other target clients.
I can see that the transports are only added to the import buffers (For the down stream systems) AFTER the Prod import is done (Maintenance Cycle status Go-Live at that point)
After the Prod import however,we get errors preventing us from importing into the downstream/follow on systems via SCMA Task List - this occurs in both Maintenance Cycle phases Go-Live and Being Completed.
For the Training/Education(E) systems we get the error:
Task cannot be executed/scheduled during the phase 'Being Completed'
Task cannot be executed/scheduled during the phase 'Go-Live'
For the Evaluation System (D) we get the errors:
Action SM_IMP_TEST is not allowed in this phase (ie Both Go-Live and Being Completed)
Has anybody come across this problem before and found a Solution.
Thanks
Kevin
Hello guys, The company requires a new class of change that can be a copy of the normal change but it needs a new approval before the OT is imported to PRD, what is the best way to do it?, I have configured ChaRM before but in a standard way, 1. can be the approvals linked to the status of the change document? or 2. I need to set a new status copy of some in the standard?. 3. Can I add this "new" class of change to the create menu in Change Request Management?.
Thanks in Advance for your help
Paul
Dear Experts,
I have just finished setting up a new client in solution manager and I am trying to create a new categorization schema in that new client. While assigning a new Application area, as soon as select the Application ID as "Service Request/Incident" and Parameter as "Transaction type/Catalog category", I get a dump message stating
500 SAP Internal Server Error
Error: Field symbol has not yet been assigned.
It also registers a GETWA_NOT_ASSIGNED dump in ST22.
Category ABAP Programming Error
Runtime Errors GETWA_NOT_ASSIGNED
ABAP Program CL_CRM_CATEGO_GENIL===========CP
Application Component CRM
Date and Time 07.04.2016 22:52:21
Short text |
Field symbol has not yet been assigned. |
What happened? |
Error in the ABAP Application Program |
The current ABAP program "CL_CRM_CATEGO_GENIL===========CP" had to be |
terminated because it has |
come across a statement that unfortunately cannot be executed. |
What can you do? |
Note down which actions and inputs caused the error. |
To process the problem further, contact you SAP system |
administrator. |
Using Transaction ST22 for ABAP Dump Analysis, you can look |
at and manage termination messages, and you can also |
keep them for a long time. |
Error analysis |
You attempted to access an unassigned field symbol |
(data segment "-1"). |
This error may occur if |
- You address a typed field symbol before it has been set with |
ASSIGN |
- You address a field symbol that pointed to the line of an |
internal table that was deleted |
- You address a field symbol that was previously reset using |
UNASSIGN or that pointed to a local field that no |
longer exists |
- You address a global function interface, although the |
respective function module is not active - that is, is |
not in the list of active calls. The list of active calls |
can be taken from this short dump. |
Could you help me overcome this error to proceed further?
Also, for your information, category modeler works in the existing client without any issues and this problem is occurring only in the new client that is recently built.
Thanks,
Dinesh
Hello!
My customer do not want to use charm for all systems (logical components) that persist in project. They want to activate charm just for some systems. And in the same time they do not want to delete systems (logical components) from project which is not supposed to be used by charm.
If I would not make charm settings for systems (logical components) which is not supposed to be used by charm I get mistakes in project checks and can not create cycle.
If I'll make charm settings for all systems (logical components) then I will be able to select any of systems in charm documents and should transport changes by charm changes documents.
Any advice how to deal with it?
Is there any way to restrict to choose particular systems in change documents?
Regards, Diana
Hello All,
we are in progress of Solution Manager Configuration in Transaction Solman_Setup. we have successfully completed first 5 steps under System preparation. In the 6th step Prepare landscape Description we are in the step "Select SLD". Here we wanted to use our PI SLD. so we have given the PI SLD host name and the port along with the user that is needed for connecting. The User is created with the needed roles. Now we wanted to register solution manager in that SLD itself. so we have selected the option "Change DS Target" which in turn opened a new window. There we have given the required details like Abap and Java user(SOLMAN_ADMIN), current client, instance, the SLD server, gateway host and gateway port(of PI) and in the users SLDAPIUSER and SLDDSUSER we have given the users which are created on PI with appropriate roles and for CTC users we have given our passwords and then tried to save and move on to next. Here we are getting an error stating the the pw are wrong or user is locked for the users SLDAPIUSER and SLDDSUSER. Again we have tried them in a different way by creating them on Solman itself and tried. still it didnt work:(
Note: UME of solman pointing to current client only which we have noticed earlier and changed.
what might be the issue here? usually on where those users needed to be created on PI(as we are using PI SLD) or on Solman.
please do help us as we are stuck at this step and we have a very long way to go......
Regards,
Bala.
Dear experts,
I am doing an upgrade Dual-stack on SOL MAN 7.1 with SUM1.0 SPs16 from Original Support Packages of SOL MAN 7.1 to SP Level 14.
Oracle Database 11.2.0.3
SOL MAN 7.1
Windows 2K8 Standard 64bit
I am facing with a problem in phase Execution :MAIN_SWITCH/SUBMOD_SWITCH_KERNEL/GETSYNC_SCS_FINISHED
This phase is running very long time without errors, approx ~2 days. But I realized that there was no changes anything in /SUM/abap/log/* from then until now. So, I don't know how to trace this problem.
Please help me to resolve and see attached logfiles
SAPup.log
***********************************
# Executing module 'MAIN_SWITCH'.
# BEGIN MAIN MODULE Downtime I: Switch tables and Kernel
# Starting phase execution with maxpar = 3, scheduled: 18x'-'
...begin dialog at 20160406111957
...end dialog at 20160406112034
CURRENTPHASE MAIN_SWITCH/SUBMOD_SWITCH_KERNEL/GETSYNC_SCS_FINISHED
...started at 20160406112034
# Checking for syncpoint SCS=FINISHED
# Java has status "", we'll wait and check every 20 second(s).
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 5 minutes before logging...
# Java has status "", wait another 60 minutes before logging...
# Java has status "", wait another 60 minutes before logging...
# Java has status "", wait another 60 minutes before logging...
# Java has status "", wait another 60 minutes before logging...
# Java has status "", wait another 60 minutes before logging...
# Java has status "", wait another 60 minutes before logging...
# Java has status "", wait another 60 minutes before logging...
***********************************
Hi,
I want to upgrade Support Package via SUM. When the step Specify Credential I got error that username or password is incorrect. Whereas I input a correct password. I used <SID>ADM and the password within os level user.
I have been check note 927637 and try to applied service/protectedwebmethods = DEFAULT in profile parameter within SAP System but still error.
Here attached my screenshot.
Thanks in advance.
Hi Solution Manager Experts,
1. I just upgraded my sandbox system to the latest enhancement pack level, want to see any code changes have been made in my new enhancement system with respect to my old version? can i do it with Solution Manager?
Previously we use to work with panaya tool and find the change code analysis. Now i heard we can do the same analysis using solution manager tools.Is this correct? if Yes, will it be accurate as panaya tool?
2. can some one shed some lights on how to find the code changes of my latest patch sandbox system with compare to the old sandbox system using solution manager?
I got some links, which are old, can some one help me with any sap guide, sap blog, sap post or document that would be really helpful
Upgrade impact analysis (Panaya vs Sol Man)
Thanks in advance,
Hi experts,
we have upgraded Solution Manager 7.1 to SPS 10 now and since the upgrade of all DAA instances we automatically get the IIS instances on those hosts. Since we are not using the monitoring of 3rd party systems, the questions is how to disable the automatic discovery of those IIS instances? We only want to monitor our SAP systems in Solman, for the rest Nagios is in place. I have tried to delete the discovered IIS parts in LMDB, but that doesn't do the trick. After the DAA starts on that host, it gets automatically synchronized again. :-(
Regards,
Michael
Hi Gurus,
Need help with this alert which i am getting from Solman 7.1 SP10.
ABAP Message Server Status | XXX-ABAP | ![]() | ![]() | ![]() | 3 | 3 | 3 | No process found for: msg_server(.*) |
I have already checked following notes but no luck
1419603 - Missing ABAP SAP Central Services (ASCS) instance in SLD/LMDB
1916237 - ABAP Central Service not available alert in Technical Monitoring
Our managed system kernel is 720 P 401 as per-requisites for the sld registration.
Have tried few things here and there but no luck.
Please suggest is any has any suggestion or solution.
Dev
Hi All,
I want send data to SLD from SAP system in another network (WAN). I use sldreg to send data and data successfully sending to Solman not to SLD. In Solman with TCODE SMSY I can see the server, but not for database and other. When I check in solman with tcode LMDB, I cannot see my technical system. When I create technical system manually all of product is blank. Should I fill manually? Whereas when I use local connection and send data with RZ70 tcode I can see all my technical system automatically both in SLD and Solman.
An additional I cannot see SAP system in SLD if get data from SAP System in another network. Am I missing some step? Look like data send succesfully, but in SLD is no data.
Here the screenshot.
Thanks.
Hello Gugus,
we install SP-A/PI 01P_700 in our ERP System (NW 701).
In Phase DDIC_ACTIVATION we get the following error:
TP_STEP_FAILURE RC 12 Main language for documentation module /SDF/WS_MON not found.
Protocoll:
2.921 switch copied for activation, 12 for deletion
Business function set /SDF/WS_MON has been deleted
Start of deletion process for business function set /SDF/WS_MON
Main language for documentation module /SDF/WS_MON not found
Error while copying DDIC objects from switches
We only have language EN and DE in our SAP.
Has someone a suggestion how we can fix this?
kind regards
Chris
Hi,
We are facing issues when we add project and structures to RFC.
After saving the RFC when we go to the service tab in the project and navigate the node for which the RFC was created, we dont see the RFC No. there.
We could see that Change transaction is created by no other information is updated.
Please advice.
Regards
Abhishek
Hi All,
I'm about to upgrade an Oracle 10g database to 12c but there is a note in the Upgrade Guide for UNIX that says :-
Make sure that processes that log on to the database, such as CRON jobs, are not active during the upgrade.
Make sure that you reschedule these processes when the upgrade has finished.
So my first thought was Solman.
So my question is, how do I prevent or rather pause Solman from attempting to connect to this database whilst I perform the upgrade?
Is it simply to schedule a Planned Downtime phase via Work Mode Management is that sufficient?
Reason I ask this is because 3 of my sap systems running Oracle have a scheduled Planned Downtime every night for an offline backup and yet I see errors in the system log for Solman that it still tries to connect to them several times during the planned downtime!
I need to prevent this from happening.
Thanks
Craig
Hi All,
I am using SAP Solution Manager 7.1 SP13.
We are planning to do upgrade the ECC landscape from EHP6 SP04 to EHP7 SP12 .
Already the UPL is activated in the production system.
So i have generated the xml and generated the SAP Module oriented Blueprint (Process Step Library) with dynamic TBOM through SEA analysis.
SEA job almost ran for a week and generated this SEA report .
But i am not able to find the clear document how to analysis this report .This is new functionalities shipped from SAP Solution Manager 7.1 SP11.
In the SEA analysis , We have summary, Modification/custom development , Test management and Updated SAP Objects.
In Modification/custom development, we have Impact to Modifications [number of objects] and Custom Developments with Development and Unit Test Efforts details.
But i am not about find clear document about to analysis these details in the report.How to compare these details with ERP landscape and test the effected object.
Also what is the difference between in the report of Custom Development Management Cockpit(CDMC) - Upgrade / Change Impact Analysis and SEA analysis report.
Any idea, helps or tips to analysis the SEA report.
Rg,
Karthik
Hi All,
Greetings...
In one of my projects, I want to customize the template provided by the SAP in test case description.
We can add test case description while creating Manual Test Case (Tx: STWB_TC), Test Script and Test Configuration (Tx: SECATT)
I want ot update the default template with the custom template.
We had tried to update the same in SOLAR_PROJECT_ADMIN --> select Project --> Project Standard --> Project Templates --> Documantation Types, selected TD1, Test Case Description of Complete Directory of Document Types and using Document Template --> Change and Import we tried to update the template. In the document type, it has been changed but it is not reflecting in the other transactions.
Please help me in this regard to update the test case description.
Thanks in Advance
Saman
I am searching for a monitor to provide alerts on the SCM CIF Postprocess (/sapapo/cpp). Can someone provide some guidance? I have set up monitors to handle data consistency on the transactional data (CCR). We are running SolMan 7.1 sp13.