Good Day,

 

I hope someone could shed some light on the subject. Need clarification on Solution Manager Configuration.

During the System Preparation I need to connect the Diagnostic Agents to the SLD.

 

So this is how I understand it:

 

Solution Manager I Install:

  • SLD,
  • Wily Introscope,
  • Host Agent,
  • Diagnostic Agent

On my Satellite server i.e: DEV, QAS and Prod I Install:

  • Host Agent,
  • Diagnostic Agent.

 

What i did:

Solution Manager Diagnostic Installation:

  • SID: DAA
  • Register in Existing Central SLD: (Basically I am registering Diagnostic on Local Solman SLD)
  • SLD HTTP Host: (Solution Manager IP ADDRESS)
  • SLD HTTP PORT: 50000
  • SLD Data Supplier User: SMD_ADMIN ( For some reason it does not accept the SLDDSUSER, ALL Auth Correct. So went with SMD_ADMIN)
  • Configure Connection via Java SCS Message Server
  • HOST(FQN): (Solution Manager IP ADDRESS)
  • JAVA SCS Message Server HTTP Port: 8102 (02 is SOLMAN SCS Instance Nr)

 

Satellite Systems Diagnostic Installation:

  • SID: DAD (DEV), DAQ (QAS), DAP (PROD)
  • Register in Existing Central SLD: (Basically I am registering Diagnostic on Local Solman SLD)
  • SLD HTTP Host: (Solution Manager IP ADDRESS)
  • SLD HTTP PORT: 50000
  • SLD Data Supplier User: SMD_ADMIN ( For some reason it does not accept the SLDDSUSER, ALL Auth Correct)
  • Configure Connection via Java SCS Message Server
  • HOST(FQN): (Solution Manager IP ADDRESS)
  • JAVA SCS Message Server HTTP Port: 8102 (02 is SOLMAN SCS Instance Nr)

After each installation of the Diagnostic Agent I :


Update host_profile:

service/admin_users = <solmanhostname>\SAPServiceDAA <devhostname>\SAPServiceDAD <qashostname>\SAPServiceDAQ <prodhostname>\SAPServiceDAP


run Script:

smdsetup managingconf hostname:"sapms://(Solution manager FQDN, not IP address)" port:"8102" user:"smd_admin"pwd:"PASSWORD"

I restart each Diagnostic Agent.

Rerun Step 5.3 Create logical Ports.

Wait a few minutes. Then try and Get Agents on Step 6.3.

This is when the setup gives me two errors:

  1. 1. SOAP:1.023 SRT: Processing error in Internet Communication Framework: ("ICF Error when receiving the response: ICM_HTTP_CONNECTION_FAILED")
  2. 2. Web service invocation problem on host solman.cenored.com and port 80 protocol : http logical port name : LP_WS_SMDAGENT_MONITORING

What I have also noticed is on step 6.1 with SLD configuration it’s only showing 1 Agent (I presume solman’s)

So my question to you would be is my approach correct? Or Should I create an SLD on each satellite system and connect each Diagnostic Agent to its own local SLD and then add the local SLD’s in step 6.1 or can I leave it as is with only solman local SLD and all Diagnostic Agents connect to the single SLD.

 

The error seems to be in line with the Webservices not running or port being blocked or not open? Checked, all Ok.

 

Not sure what I am doing wrong any guidance would be very helpful. Not sure why I am getting this error and can’t find any info that has helped me resolve this issue.

 

Thank you

Johann


Start your plan change event with Scope and Effort Analyzer

$
0
0

The intension of this document to get basic understanding for Scope and Effort Analyzer so one can start SEA run comfortably.

 

Scope and Effort Analyzer is an innovative tool of SAP Solution Manager, available from 7.1 SP11, and it is very useful and beneficial for those SAP organizations who is looking to reduce the costs and efforts associated with major Maintenance or Enhancement Package (EHP) upgrade projects.

 

Key Differentiator

 

The key differentiator for SEA (Scope and Effort Analyzer) is that, it can predict the two major cost and effort drivers of maintenance project – "1. Development Managment and 2. Test Management" at the planning phase.

 

  • Identification of custom code and object modification adjustment, what has actually changed before actually upgrade. Early upgrade change impact analysis without physical EHP/SP installation.
  • Reducing the amount of test redundancy by identifying only those processes that need to be tested.

 

Automating change impact analysis and test scope identification before application of the Maintenance and EHP will significantly reduce the project planning and test execution phases of your project.

 

How SEA work

 

The solution manager is send the information of system and planned SP/EHP entered by the user to SAP. SAP calculates SAP Objects (TBOM)
for enhancement pack and send back to Solution Manager.
Solution Manager offers the impact analysis, effort calculation, test scope and effort optimization.

 

 

 

Preparation Of Scope and Effort Analyzer

 

Below are the Steps to start work with SEA based on our experience with SEA.

 

1. Finalize your scope for SEA

 

  • Planning of maintenance events such as SPs or EHP deployments. Identify the involved managed system for which SEA calculates the development and test effort.
  • Base on this decision choose the system role for SEA run.

 

The different system Roles are as: 

 

Role 1: Custom development and modification analysis

 

It is recommended to Select the production system for this system role. This ensures that only those custom developments are analyzed that are actually deployed to production. If you wish to extend the analysis also to project work not yet released to production, you can choose other systems, such as a development system.

It is possible to run two SEA analysis – one with the dev system and the second run with the production system as source system for custom code and then compare both results.

 

Role 2: Read usage statistic:
Select Production system as only here actual usage information exist.

 

Role 3: Test scope optimization activities: Recommendation is to consider your Quality system here which is on the identical SP level as the production system. Reason
for selecting quality system is the TBOM. These TBOMs will be generated during the SEA run for this selected system which is generate significant load.

 

 

2. Complete Pre-requisite

 

Solution Manager

 

 

  • Install or upgrade your solution manager 7.1system up to the level SP11. Ensure component ST-BCO 7xx SP10 is available.
  • Complete basic configuration like System preparation, Basic Configuration and Managed System Preparation for all require Managed System.
  • The latest version of SAP Solution Manager Central Correction Note (CCN) shall be implemented. E.g. in case of SP11 the SAP note is 1933506, for SP12 it is 1969109 and for SP13 it is 2048215.
  • Get all require authorization.
  • Maintain all managed system properly in LMDB.
  • Maintenance Optimizer setup.
  • Maintain Valid S-User ID for the ID use in SEA run.

 

Managed System

 

  • The latest available version of the ST-PI component should be implemented (at least 2008_1_x SP 9)

 

 

SEA is extensively using usage analysis for UPL. With help of Usage and Procedure Logging technique it is now possible to calculate the
impact to custom code, modifications and business processes in consideration of the real system usage. Make sure that all productive systems you intend to
analyze fulfill the technical prerequisites for Usage and Procedure Logging (UPL) activation. Please refer SAP Note
1828848 - Usage and Procedure Logging: Technical prerequisite and 1955847 - UPL: Activation Procedure and Authorization Handling in SAP Solution Manager (SP5 - SP11)

 

You can also refer https://service.sap.com/~sapidb/011000358700000427102012E  and http://scn.sap.com/docs/DOC-60682

 

Please note that Scope and Effort Analyzer can be used in absence of UPL data too, but with limitations based on the missing usage information. Without UPL data it is not possible to get the used or unused custom code objects and modifications. And it is also not possible to calculate savings by adjusting only used
objects.

 

Please note that without UPL data, it is not possible to generate semi-dynamic TBOMs. In this case only static TBOMs can be generated. Static TBOMs might be less effective compare to semi-dynamic TBOMs.

 

 

3. SEA Set up

 

Run SOLMAN_SETUP configuration step.

Custom Code Management (Steps 1 – 6 mandatory for SEA). This setup procedure activates UPL and custom code data collection. You can refer SAP note 1906451: Technical Preparation for Custom Code Management.

 

Please refer this link for SEA How to guide http://support.sap.com/content/dam/library/SAP%20Support%20Portal/support-programs-services/solution-manager/processes/Media%20Library/Test%20Management/HowToSEA.pdf

 

4. Check and Ensure your set up

 

Once you complete the all set up it is very important to know whether all set up done correctly without any issue and your all systems are ready now for SEA run. Please use below report to ensure your set up.

 

Run report AGS_BPCA_SELF_CHECK in SAP Solution Manager to verify the TBOM authorizations and UPL set up validation.

 

Check-Report for Custom Code Infrastructure. Use SAP Note 2077995

 

Ensure below jobs are completed in your Managed system without any error.

  • RSCVR_TRIGGER_COLLECT                
  • /SDF/UPL_PERIODIC_EXT_JOB           
  • /SDF/TCODE_SIMILARITY_IS
  • /SDF/CC_REFERENCES

 

Check and if necessary activate the ICF Services as described in SAP Note 1983399. Call transaction SICF and search for the following services:

  • /sap/bc/webdynpro/sap/ags_sea
  • /sap/bc/webdynpro/sap/AGSSEA_ANALYSIS
  • /sap/bc/webdynpro/sap/AGSSEA_CREATE_ANALYSIS

 


5. Data colletion Run

 

Once your UPL is active, it is recommended to collect at least 3 month data before you start SEA Run. In exception you can start work with at least 4 week data. The intension here to collect maximum usage information of your managed system including some time specific actions like monthly, quarterly or yearly activities.

 

 

6. Run Scope and Effort Analyzer

 

Call transaction code SOLMAN_WORKCENTER and Select WorkCentre then Implementation / Upgrade - Plan - Create or view Scope and Effort Analysis. This will open the main screen of Scope and Effort Analyzer. Complete all steps of Guided procedure, user help documentation available for each Step of the Guided Procedure.

Kindly refer How to Guide document for detail.



Some important points:


  • Once you select your require system (as per described in first point “Finalize scope of SEA) in specify additional system, please do “Perform checks”. This will ensure the fulfillment of all prerequisites of each selected system,
  • For business blue print selection session it is recommended to select the option Create a Project and Business Blueprint for executables not covered or in case if you have existing blueprint for the project use combine approach. After SEA run new project will be created automatically, which will contain modular base business blue print and the Custom developed executables are detected as well and assigned under a special blueprint node “CUSTOMER – Customer Executables” and structured by development classes, in case they are available.
  • Under Test Scope_test scope optimization_Test Case Recommendation for creating Test Cases you can specify the limit - up to which, test coverage percentage for automated tests can be considered. These values can be changed in the analysis result view later.
  • From “Continue Target system definition” you will reach at Maintenance Optimizer. Here perform up to the 3rd step - download files.
  • Start analysis from Work Center in SAP Solution Manager. You can track status of background jobs in SAP Solution Manager system.

 

The background processing can take up to several days depending on the amount of data to be analyzed and collected (for example to read and analyze the impact to custom code objects or to generate the semi-dynamic TBOMs). SEA does provide a processing log to monitor the progress of the background tasks.

Once all background jobs are finish the analysis result report is available for collection and further project related usage.

 

Here are some important list of notes, which you can consider if you are facing any issue in Analysis run.

 

2053406            ST-PI Version/Level to low

1981662            Error in Scope and Effort Analyzer

2080645            In Scope and Effort Analyzer, the TBOM generation is failing with an exception 'Control Framework: Fatal error - GUI cannot be reached'

2087046            Error displaying Test Coverage values in the analysis settings

2064567            SEA Functions "Process Modifications" and "Process References" fail

2030349            SEA Check "Check ST-PI version in custom code system" fails although ST-PI version is sufficient

1983433            SEA Function "Get SAP References Results" - Issues

1997185            SEA Function "Get Custom Code & Modification Results" stores inactive modifications.



SEA Result Analysis

 

Once your analysis is ready, you can view the result. Please note that all result are based on the average value we set. Depends upon your experience you can change the average value and get the new result.


5. Average Value.JPG

 

Please use below link to get the detail document related to SEA result analysis.

https://support.sap.com/content/dam/library/SAP%20Support%20Portal/support-programs-services/solution-manager/processes/Media%20Library/Test%20Management/SAP%20Solution%20Manager%207.1%20Scope%20and%20Effort%20Analyzer.pdf

 

Here are some important area of SEA results,

 

Summary report

Development and Unit test Effort for your Custom development and modifiction for which adjustment is  require. And here also you will get Regression test effort.


1.Summary.JPG

 

Modifications and Custome Codes

 

Here you can have the Development and Unit test Effort for your impacted Custom development and Modifictions for which adjustment require.

You can also get the details of Modification and Custom development.



2. Modifications.JPG

 

3.Custom Developments.JPG

 

Test Management

This will provide you the number of test cases requie to be test with TSO (Test Scope Optimization) and also Test effort with Test Scope Optimization.

Identification of impacted Business Process Scenarios, Processes and Steps.

Test Scope and Effort with TSO - Full Scope versus Custom Code and Modifications

In Test Case Recommendations you will get recommendation for the creation of missing test cases ( either manual or automated test case ) and you also get recommendation of replacing existing manual test case with automated test case. Then you can have the Test case creation and execution efforts accordingly.

In Test Case Optomization ranking by setting ranking you can optimize your test coverage.

You can also get the Business Process Hierarchy wise test effort distribution (manual, automated)

 

 

You can generate or update your test plan from the result.

4. Test Managment_1.JPG

 

4. Test Managment_2.JPG

 

4. Test Managment_3.JPG

 

Updated SAP Objects

Here you will get the Changed SAP Objects distribution list by Application Component wise and Object type wise

 

6. Change Object.JPG

 

About the Author:
He is part of TCS Run SAP CoE team having expertise in SAP Solution Manager functionality from ALM & RSlaF like Solution Documentation, SoDocA, Test Management, BPCA, BPMon, BPAnalytics, JSM etc.


Custom Partner Function not working

$
0
0

Hello,

 

We are on Solman 7.1 SP8, I defined a custom partner function as required by business team and was able to successfully add it on the CRM-UI screen.

 

The problem is when you try to choose a particular business partner  from the F4 help, the field remains blank.

 

Tried a lot but unable to resolve this problem. Please help in understanding and resolving this issue.

 

Thank you.

 

 

Prashant.

Confused about ST-PI Versions.

$
0
0

Good Morning everyone,

 

I was wondering ...

 

What exactly is the difference between ST-PI 2008 and ST-PI 740 and when do I use which one ?

What are the Minimum Requirements ?

Could I use it with Basis Release 7.31 and 7.02 and which ST-PI would be the better choice ?

 

Regards,

Thomas Schmitt

Summary of historical activity levels: most popular T-Codes and sub-modules for our users?

$
0
0

Hello, I've posted this in Business Warehouse, but a moderator suggested posting it here also.

 

We are doing a comprehensive review of our financial ERP systems and how we use SAP. My assignment is to prioritize a list of sub-modules and T-codes for review, and I am to prioritize these based on user activity. I will be conducting a user survey, but I need to support it with back-end analysis. How can I view data on:

 

  • Which sub-modules of FI have the heaviest user activity?
  • Which T-Codes are run most frequently, and by whom?
  • Which sub-modules and T-Codes have the most diverse user activity? (Highest number of distinct regular users)

 

I am not very familliar with Solution Manager, but the moderator mentioned standard Earlywatch reports. I will appreciate any further information about how to pursue this data. I have a lot to learn about SAP, so I am always open to additional research/reading if you can point me in a good direction for this question.

 

Thank you

BPMON integration with Third party tool

$
0
0

Hello All,

 

We have a requirement for integrating BPMON alerts to third party ticketing tool. Right now, we send notifications directly through mail id. Would like to raise an incident through the third party tool. In our environment, we use netcool as ticketing tool and we are in SOLMAN 7.1 SP12 .


Can someone help on this ?

 

 

Thank you,

 

 

Regards,

Kavitha

Do It Yourself: Technical Operations Dashboards in 7.1

$
0
0

Fellow Members,

 

Background: It's been a quite a long time, I was in a kind of hibernation from SCN. I thought of sharing some interesting stuffs I learnt recently. I use the term 'interesting' since, prior to this, I had no clue on how to write a code or written a single line of code in my career as a SAP Consultant.


We all know from the 7.2 promo videos and webinars, that,  there will be many UI5 based dashboards are on offer for Technical Monitoring, BPO etc, which is great news and we are all looking forward to it. I hope this release will have a quick to access reports and dashboards in a central place giving a break to "so many clicks here and there" type of complaints you hear often from customers for any solman functionality you demo to them.

 

We all know, Management Dashboards and CIO dashboards are most sought after features in technical space nowadays. Some customers may want to extend the same 'look&feel' of Mgmt Dashboards to other reports and graphs available in Solution Manager 7.1 workcenters. Recently I came across a unique situation where I had to make a simple dashboards for intelligently displaying some of the most important reports already available in various workcenters of Technical Operations in 7.1. In short, senior management team from IT side wanted to "see" all the possible reports in "one place" with a single click of a button. I suggested them to bookmark all the workcenter links and dashboard URLs in their browser , however that was not a satisfying answer for them for obvious reasons.   So I googled and found out that we can make custom HTML5 and CSS based website look alikes or mock dashboards which can be used to meet such demands. The result would be a whole new way of accessing and displaying the same reports from workcenter in a dashboard look and feel way ! Or something like this;

 

sshot-1.jpg

 

How do you build such dashboards?

 

It is a not a much difficult task, you need to have a CSS, Javascript and HTML basic coding knowledge. There are many free to use templates available in github & sourceforge, which you can use as a reference. Most important thing to remember here is, we are neither developing any z reports out of Solution Manager 7.1 nor writing any BW queries, but we are just fetching the data from workcenter and displaying them in a structured way. For this,the most useful HTML5 feature I use is, the <iframe> tag to specifies an inline frame. An inline frame is used to embed another document within the current HTML document. So I create a HTML page and then use <iframe> feature to display a report from workcenter. Any workcenter graph would have seamless display within your HTML page; for example; the Availability  reports from Interactive Reporting would look like this;


sshot-3.jpg


Or this report in a dashboard showing User Activity on a Monthly Basis;


sshot-2.png

sshot-3.png


Or a System Monitoring entry page (Technical Monitoring Workcenter> System Monitoring> Select All Systems> Open in a new Window) can be displayed like below; here is an unique advantage for such display;the below page in workcenter has auto refresh window starting from 5 minutes unless you manually refresh the browser. If you embed this view in a HTML page and use <meta http-equiv="refresh" content="30" > code, then the page auto refreshes every 30 seconds, fetching latest ratings.

 


sshot-4.jpg

sshot-1.jpg

Or go for a Inception concept with CIO dashboards ( Dashboard within a Dashboard within a Dashboard (?))

 

sshot-7.jpg

 

At the end, your goal is to have a  single html page for the every URL from workcenter you want to display; to do that, you need to deploy all the individual HTMLs on a tomcat. For me it was something like below after the completion of all the dashboards creation;

 

sshot-5.jpg

Now you can deploy these pages on a Tomcat so that these dashboards are accessible company wide with a single click. To deploy it on a tomacat, download the latest tomcat from https://tomcat.apache.org/download and place the entry page (index.html) in the webapps folder along with the rest of the files (css, js and htmls) like below. Place this tomcat folder along with all the content on a server. I usually deploy it on a solman server itself so that it is consistent with rest of the URLs;

sshot-6.jpg

Now you are good to go; just type http://<server where you placed these files>:8080/index.html in a browser and you have your own dashboards !

 

sshot-8.jpg

 

 

Hope this helps; and I am curious to know if any of you would try such tasks If so, please leave a screenshot of your dashboards; so that I would know that I am not the only person getting such requests from customers


Usefull Links:

http://www.w3schools.com/js/js_examples.asp

http://www.w3schools.com/tags/tag_iframe.asp

http://www.w3schools.com/css/css_examples.asp

https://tomcat.apache.org/download-80.cgi

 

Regards,

Vivek

"Error while trying to add Ext Ref field in ChaRM CR form by using personalized settings"

$
0
0

Hi Experts,

 

I have got the below error when I tried to add the External Reference field in the ChaRM CR form in Request for Change. I have already used one external reference field for adding incident but when I tried to add the same field in the project planning section and save it to a transport request. When I try to open the form using SM_CRM I got the below error: Please help

 


Untitled.png


SUM error at step PREP_INSTALL/SHDINST_OS! in phase configuration : " Action 'install' for DCOM service failed"

$
0
0

Hi Experts,

 

I am using the Software Update Manager SP 13 to upgrade my solution Manager 7.1 SP11 tp SP 13 on windows system.

 

However i got the following error in Configuration phase at step: PREP_INSTALL/SHDINST_OS!

 

 

Severe error(s) occurred in phase PREP_INSTALL/SHDINST_OS!

 

Last error code set: Action 'install' for DCOM service failed, see phase   log for details: Cannot create a file when that file already exists.
<br/>
  

 

 

Please advice,

Thanks,

Raja

SAP Web Dispatcher 7.42 System Monitoring

$
0
0

Hi,

 

I am in the process of setting up monitoring for our Web Dispatchers. I have completed the managed systems config with the following product instances:

2015-08-05 15_52_20-Landscape Management and Logical Components - Start Screen - Internet Explorer.png

During template assignment, I cannot assign a template because Installed products is blank:

2015-08-05 15_54_50-SAP Solution Manager Configuration - Technical Monitoring - System Monitoring - .png

Have I missed anything?

 

Our SolMan system is 7.1 SP12. Any help would be highly appreciated.

 

Thanks.

ChaRM: Reassign Change Document

$
0
0

Hi

 

We are on Solman 7.1 SP12 and are trying to reassign a change document (ZMMJ) to another project.

 

It works fine for me but I have a high level of authorizations.

 

For other users of ChaRM, they click on Edit (in CRM Web Client) > Reassign Change and then a search box appears.

 

However, when they click on search they cannot view any projects (when I click search I can).

 

I've searched everywhere online but can't find what authorization is missing.


Can anyone help?

 

Thanks
Shaun

Analytical Key Figure Respository Name is empty

$
0
0

Hi All

 

Our Solution Manager system is on 7.1 SPS 13. We are trying to Configure BP Dashboards. In Solution Manager, When going to solman_workcenter and "Business Process Operations(New)" and "Setup Dashboards" and when trying to "Add" a New "Analytical Key Figure Instance" , the "Analytical Key Figure Repository Name" seems to be always Empty. The BP Dashboards related Notes for SPS 13 have already been Applied.

 

Can you please suggest Approach for fixing this issue.

 

Regards,

 

SAP Basis - Solution Manager Consultant

How to change status from "validation" to "to be approved"

$
0
0

I'm currently facing the problem of not being able to change the status from "Validation" (German: Überprüfung) to "to be approved" (German: zu Genehmigen)

 

06-08-_2015_14-23-55.jpg

06-08-_2015_14-13-09.png

What do I need to customize in order to be able to change the status?

ChaRM certification

$
0
0

Hello


I want to give ChaRM E2E200 SAP certification, can you please help me how can I go for it, where can I get details like- Cost, training material, where Can I apply and how to apply ?


It will be appreciable if someone had done this before and can guide me ?


Just for info, I haven't undergone any formal training, but have worked in ChaRM implementations before and quite comfortable with it.


Am Currently in India.



Cheers,


Ankit

Solution Manager 7.1 SR 1 Installation on Windows Server 2012 from Scratch

$
0
0

Hello,

 

I'm new to BASIS and am trying to install SolMan 7.1. SR1 on Standalone Server - I got an error " Solution Manager Diagnostics (SMD) server host is not reachable. Make sure that the server is running and that the host name and port are correct. Choose "Cancel" to modify managing configuration or "OK" to continue. If you choose to continue you will have to execute the smdsetup script later".

 

Please  suggest me - what to do ? Select OK or Cancel ?

 

OS : Windows Server 2012 - 64 Bit

DB : MS SQL 2012

 

Installation file using "70SWPM10SP08_4-20009707" - "sapinst "

 

Attached screen shot.

 

Thankful.


How to add new report on ITSM BW REPORTING

$
0
0

Hi ,

I need to add in the tabs section on top of the application : ITSM BW REPORTING, a new tab with a link to a BW report.

 

How I can do it?

 

Thanks.

 

Andrea

SMD_AGT user getting locked frequently in Solution Manager

$
0
0

Hi, User SMD_AGT getting locked frequently within 1 hr,  in Solution Manager system 7.1 SP12. All the agents are registered with SMD_AGT user without any issue.I have also checked through RFC; credentials are fine. SM21 05:19:09 DIA  014 100 SAPJSF                      US  1 User SMD_AGT locked due to incorrect logon M  ***LOG US1=> Login, Wrong Password (SMD_AGT ) [sign.c      4862] No dump in the system for this isseu and nothing in the trace. Please suggest on this. Thanks, Harsh

"Error while trying to open ZSOLMANPRO link in ChaRM"

$
0
0

Hi Experts,

 

I am receiving the below error while trying to open the ZSOLMANPRO while trying to open the change request form.

 

I tried opening through SOLMANPRO and go into the ZSOLMANPRO via personalized settings, and tried to correct if I have done any previous changes. But no Luck. Please suggest.

 

ZSOLMANPRO_ERROR.png

"Urgent Change is getting generated with Status "In Development", Instead of created"

$
0
0

Hi Experts,

 

I am in the Process of CHARM Implementation.

 

Following Documents Have Been created by Me

 

ZMCR

ZMHF

ZMMJ

 

Mapping is Done as Follows

 

ZMCR --> ZMMJ

ZMCR --> ZMHF

 

I have added the scope in ZMCR as ZMHF, and the ZMCR has been approved.

 

When the status of the ZMCR is set for " Release for Development", i.e. Beeing Implemented

 

ZMHF Document is getting generated, but the status of the Document is "In Development".

 

I want status of the Document to To "Created".

 

Any Pointers, what could be the issue.

 

Regards,

Mujeeb.

Dispatching is not working in ITSM

$
0
0

Hi Experts,

 

 

Dispatching functionality is not working in the ITSM. I had checked the service manager files etc. Also I had read the wiki page about it.

 

Please help.

 

Best Regards

Nimesh

Viewing all 5569 articles